We're sorry but our website doesn't support retired and out-of-support versions of internet explorer.

To view the full website, please try visiting this website again in a modern browser.

Ask us!

[contact-form-7 id="13" title="Contact form 1"]

Local Council offices lift replacement

A full turnkey replacement completed in six weeks, with zero disruption to residents.

Key Details

  • Client: Local Council
  • Location: West Yorkshire
  • Sector: Local Goverment
  • Service: Turnkey Replacement
  • Duration: 8 weeks
  • Completed: January 2025

The Challenge

A West Yorkshire council required the full replacement of an ageing passenger lift within a busy public office building.

The existing lift had reached the end of its operational life, with increasing maintenance demands and reliability concerns. As a public-facing building used daily by staff and visitors, continuity of access and safety were critical.

The project was issued through a formal tender process. Curti Lifts were appointed to deliver a complete turnkey replacement within the existing shaft, meeting specification requirements while minimising disruption to day-to-day operations.

What We Delivered

A fully managed turnkey installation, coordinated from initial survey through to final handover.

Tender-led specification compliance
Detailed review of the client’s technical requirements, ensuring the proposed lift system met all operational and performance criteria.

Careful removal of the existing lift
Safe decommissioning and dismantling, with controlled access routes to maintain safety within the live building.

Installation of a new passenger lift system
A modern, high-spec lift built to the client’s specification and designed for long-term reliability in a public-sector environment.

Open-protocol system
Providing long-term flexibility and service transparency, avoiding dependency on proprietary restrictions.

Programme management within a live office environment
Works carefully phased to reduce disruption to staff and public access throughout the installation period.

Full commissioning and handover
Comprehensive testing and sign-off to ensure compliance, safety and operational readiness.

The Result

The council now benefits from a modern, reliable passenger lift that supports safe access across the building.

The installation met programme expectations and delivered a long-term solution aligned with public-sector standards. The open-protocol system ensures future flexibility, while improved reliability reduces ongoing maintenance pressures.

At a Glance

  • Sector:Local Government
  • Lift Type: Passenger lift
  • Works Included: Turnkey replacement, removal, installation, commissioning
  • Procurement Route: Public tender
  • System Type: Open-protocol lift system
  • Outcome: Improved reliability and long-term service flexibility

Why the Local Council Chose Curti Lifts

  • Proven experience delivering public-sector projects
  • Clear, structured project management
  • Open-protocol systems for long-term value
  • Transparent communication throughout
  • Fully managed turnkey delivery from survey to sign-off

Need a lift replacement with zero drama?

We deliver fully managed turnkey lift installations for councils, healthcare facilities, care homes and commercial sites across the UK.

If you need a contractor who understands specification, compliance and programme control, we’re ready to help.

The project was delivered in line with expectations and with clear communication throughout. Curti Lifts managed the works professionally within a live building environment.

Estates Representative, Local Authority

Ready to elevate your lift facilities?

We've delivered thousands of projects like this across the UK

24/7 Emergency Call 01274 299975