We're sorry but our website doesn't support retired and out-of-support versions of internet explorer.

To view the full website, please try visiting this website again in a modern browser.

Address

Curti Lifts
Hunters Park Ave
Clayton
Bradford
BD14 6TG

Ask us!

[contact-form-7 id="13" title="Contact form 1"]

Goods Lift Replacement for NHS facility in Newcastle

Keeping critical hospital logistics moving

Key Details

  • Client: NHS
  • Location: Newcastle upon Tyne
  • Sector: Healthcare
  • Service: Full turnkey goods-lift replacement
  • Duration: Approx. 3–4 weeks on-site for removal + installation
  • Completed: 2025

The Situation

This Newcastle NHS facility relies on a mezzanine goods lift to move medical supplies, equipment and day-to-day stock between floors.

The existing lift had become slow and unreliable, creating delays in a busy operational environment where efficiency matters. In a hospital setting, even small bottlenecks can have a knock-on effect on staff workflow and internal logistics.

Curti Lifts were appointed to replace the ageing unit with a modern, robust goods lift, delivered safely and with minimal disruption to ongoing operations.

What We Delivered

A fully managed turnkey replacement, handled from survey through to commissioning.

Detailed site survey and planning
Working within strict NHS access requirements and operational constraints, ensuring clear communication and safe coordination throughout.

Controlled removal of the existing lift
Carefully managed decommissioning and dismantling, maintaining safe working zones and protecting surrounding areas.

New steel support structure within existing footprint
A clean installation that strengthened the lift arrangement without impacting adjacent building fabric.

Modern goods lift installation
A durable goods lift designed for frequent daily use, with heavy-duty gates, non-slip flooring and improved internal lighting.

Compliance and safety assurance
Delivered in line with industry standards and health & safety best practice, with full project oversight and CDM management.

Programme control
Installation completed on schedule, allowing the facility to resume full operational use without extended disruption.

The Result

The new lift now operates reliably every day, supporting the smooth movement of supplies throughout the facility.

Delays caused by breakdowns have been eliminated, and staff can move equipment efficiently and safely between floors. The installation provides a long-term, dependable solution built for continuous use in a demanding healthcare environment.

At a Glance

  • Sector: NHS / Healthcare
  • Lift Type: Goods lift
  • Works Included: Turnkey replacement, structure install, lift installation, commissioning
  • Operational Impact: Improved reliability and reduced internal delays
  • Project Management: Single point of contact throughout

Why the NHS Chose Curti Lifts

  • One dedicated project manager from start to finish
  • Clear communication with no chasing required
  • Experience working in sensitive, live environments
  • Open-protocol systems for long-term flexibility
  • Strong track record across public-sector projects

Need a lift replacement with zero drama?

We deliver fully managed turnkey lift installations for healthcare sites, councils, care homes and commercial buildings across the UK.

If you need a contractor who plans carefully, communicates clearly and delivers without disruption, we’re ready to help.

“The new lift has already made a noticeable difference to how we move equipment around the facility. The communication and professionalism from Curti Lifts made the project straightforward from start to finish.”

Facilities Representative, NHS Site

Ready to elevate your lift facilities?

We've delivered thousands of projects like this across the UK

24/7 Emergency Call 01274 299975